State Route 24 Interim Phase II: Ellsworth Road to Ironwood Drive

Brasil Notícia Notícia

State Route 24 Interim Phase II: Ellsworth Road to Ironwood Drive
Brasil Últimas Notícias,Brasil Manchetes
  • 📰 ArizonaDOT
  • ⏱ Reading Time:
  • 30 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 15%
  • Publisher: 63%

The Arizona Department of Transportation, in conjunction with the Federal Highway Administration, completed construction of the Interim Phase II section of State Route 24 (SR 24) also referred to as Gateway Freeway, in August 2022.

This section includes approximately five miles of new freeway extending from Ellsworth Road in Maricopa County to Ironwood Drive in Pinal County.

The Interim Phase II segment of SR 24 follows the completion of Phase I in 2014, which opened the segment of freeway between SR 202 and Ellsworth Road.Maricopa Association of Governments’ Regional Transportation Plan , ADOT and FHWA have planned for an interim facility that will help serve the transportation needs of the region until additional funding is made available. The interim facility will preserve the access control plan for this corridor outlined in the 2011 Design Concept Report, and be built at-or-above grade throughout.At-grade intersections at the following locations:

Resumimos esta notícia para que você possa lê-la rapidamente. Se você se interessou pela notícia, pode ler o texto completo aqui. Consulte Mais informação:

ArizonaDOT /  🏆 264. in US

Brasil Últimas Notícias, Brasil Manchetes

Similar News:Você também pode ler notícias semelhantes a esta que coletamos de outras fontes de notícias.

State Route 95 Pavement Project: Courtwright RoadOverview Project Cost: $26 million View Project Information Flyer The Arizona Department of Transportation will begin construction this summer to replace the riding surface along a 23-mile section of State Route 95. The pavement project is between Courtwright Road in Mohave Valley and Bullhead Parkway in Bullhead (mileposts 227 to 250).
Consulte Mais informação »

State Route 51 at Camelback Road Pavement Improvement ProjectThe Arizona Department of Transportation (ADOT) will be conducting a pavement improvement project on northbound State Route 51 at Camelback Road. The approximately $1.5 million project will improve the ride quality of the freeway beneath the Camelback Road bridge by replacing a 400-foot section of the northbound SR 51 pavement.
Consulte Mais informação »

Interstate 10, Milepost 105 to State Route 85 Junction Pavement PreservationOverview The Arizona Department of Transportation and the Federal Highway Administration (FHWA) are repairing the pavement on Interstate 10 between milepost 105 and Junction State Route 85 in Maricopa County, west of Buckeye.
Consulte Mais informação »

State Route 88: Tomahawk to Buffalo roads Drainage ImprovementsOverview The Arizona Department of Transportation has completed improvements to the drainage system along SR 88 between Tomahawk and Buffalo roads.
Consulte Mais informação »

State Route 287 between Coolidge and Florence Pavement Life Extension ProjectOverview The Arizona Department of Transportation is completing a pavement life extension project on State Route 287 between Coolidge and Florence starting in spring 2022.
Consulte Mais informação »



Render Time: 2025-02-24 12:33:37