Tenants' financial aid is also being cut off.
from luxury San Francisco tower 33 Tehama on June 3, hundreds of tenants have been living in limbo.
In a letter sent to residents on Monday reviewed by SFGATE, residents were told that the"massive water intrusion" to walls, ceilings, floors and elevator shafts left damage that"will not be completed until late 2022 or even early 2023." The flood was caused by a sprinkler system failure on the uppermost 35th floor and resulted in 20,000 gallons of water cascading through the building.
Brasil Últimas Notícias, Brasil Manchetes
Similar News:Você também pode ler notícias semelhantes a esta que coletamos de outras fontes de notícias.
BART's COVID-19 mask mandate expires on MondayMasks are no longer required on the San Francisco Bay Area's BART system as the mandate requiring them expired on Monday.
Consulte Mais informação »
Possible hope in sight for Arlington Hills residents fed up with flooding issuesArlington Hills homeowners may soon get relief after dealing with street flooding for at least a year.
Consulte Mais informação »
Which NBA Teams Could Tank in the 2022-23 Season?With the 2023 NBA Draft class looking to be a good one, these teams may try to throw in the towel next season for a high draft pick.
Consulte Mais informação »
Watch: Massive waves crash over Hawaii rooftops amid ‘historic’ south swellIn the viral clip, people gather in a flooded parking lot as towering waves slam into the two-story buildings.
Consulte Mais informação »
Flood Watch in place for Tuscarawas CountyA Flood Watch has been issued for all day Sunday until Monday morning in Tuscarawas County. Be prepared.
Consulte Mais informação »