Artemis 1 Goes Back to the Launch pad, Getting Ready for its August 29th Blastoff

Brasil Notícia Notícia

Artemis 1 Goes Back to the Launch pad, Getting Ready for its August 29th Blastoff
Brasil Últimas Notícias,Brasil Manchetes
  • 📰 universetoday
  • ⏱ Reading Time:
  • 30 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 15%
  • Publisher: 63%

Artemis 1 Goes Back to the Launch pad, Getting Ready for its August 29th Blastoff By Nancy_A with some perspective by Leonard David.

During its flight, Orion will go into a distant retrograde orbit around the moon, reaching 64,000 km beyond the Moon. The flight will last 42 days before splashing down in the Pacific Ocean off the coast of San Diego. If Artemis 1 launches as scheduled on August 29, the splashdown should occur on October 10.

— a suited mannequin that will collect data on what future human crews might experience on a lunar trip. The mannequin will wear the new Orion Crew Survival System suit designed for astronauts to wear during launch and reentry. NASA’s Space Launch System rocket with the Orion spacecraft aboard is seen atop a mobile launcher at Launch Pad 39B, Wednesday, Aug. 17, 2022, after making the four-mile journey to the launch pad at NASA’s Kennedy Space Center in FloridaWhile there is definitely excitement in the space community for the upcoming launch, there is also a sense of indifference.

Resumimos esta notícia para que você possa lê-la rapidamente. Se você se interessou pela notícia, pode ler o texto completo aqui. Consulte Mais informação:

universetoday /  🏆 297. in US

Brasil Últimas Notícias, Brasil Manchetes

Similar News:Você também pode ler notícias semelhantes a esta que coletamos de outras fontes de notícias.

NASA Artemis I Moon Rocket Ready To Roll Out To Launch PadNASA Artemis I Moon Rocket Ready To Roll Out To Launch PadEngineers and technicians at NASA’s Kennedy Space Center in Florida have completed the final testing and checkouts of the Artemis I Moon rocket ahead of rolling out to Launch Pad 39B. NASA is targeting as soon as 9 p.m. EDT (6 p.m. PDT) on Tuesday, August 16 for rollout ahead of a targeted August 29
Consulte Mais informação »

NASA’s Artemis I Moon Rocket Arrives at Launch Pad Ahead of Historic MissionNASA’s Artemis I Moon Rocket Arrives at Launch Pad Ahead of Historic MissionAround 7:30 a.m. EDT (4:30 a.m. PDT) the Space Launch System rocket and Orion spacecraft for the Artemis I mission arrived atop Launch Complex 39B at NASA’s Kennedy Space Center in Florida after a nearly 10-hour journey from the Vehicle Assembly Building. In the coming days, engineers and techni
Consulte Mais informação »

Local company plays key role in historic launch of Artemis I rocketLocal company plays key role in historic launch of Artemis I rocketRedmond's Aerojet Rocketdyne has worked on the engines that will fire the rocket into space and send a capsule towards the moon since 2006.
Consulte Mais informação »

NASA's Artemis 1 megarocket rolls back to launch pad for moon missionNASA's Artemis 1 megarocket rolls back to launch pad for moon missionThe Artemis 1 Space Launch System megarocket hit the road again on Thursday (Aug. 16) for the launch pad.
Consulte Mais informação »

NASA’s Artemis I Mega Moon Rocket Begins Roll To Launch PadNASA’s Artemis I Mega Moon Rocket Begins Roll To Launch PadThe Space Launch System rocket and Orion spacecraft for the Artemis I mission are rolling to Launch Complex 39B at the Kennedy Space Center in Florida ahead of launch, currently targeted for August 29. At about 10 p.m. EDT (7 p.m. PDT) the crawler-transporter began the approximately 4-mile, journey
Consulte Mais informação »

Symbolic baton rides with NASA Artemis 1 rocket on rollout for launchSymbolic baton rides with NASA Artemis 1 rocket on rollout for launchThe baton passing is a new NASA tradition created for the Artemis 1 mission.
Consulte Mais informação »



Render Time: 2025-03-01 02:22:45